{"id":930,"date":"2025-01-07T15:03:27","date_gmt":"2025-01-07T15:03:27","guid":{"rendered":"https:\/\/www.sdmoland.com\/?p=930"},"modified":"2025-01-07T15:03:29","modified_gmt":"2025-01-07T15:03:29","slug":"welding-fume-removal-system-for-welding-training-centers","status":"publish","type":"post","link":"https:\/\/www.sdmoland.com\/pt\/sistema-de-remocao-de-fumos-de-soldadura-para-centros-de-formacao-em-soldadura\/","title":{"rendered":"Sistema de remo\u00e7\u00e3o de fumos de soldadura para centros de forma\u00e7\u00e3o de soldadura"},"content":{"rendered":"
The installation of the welding smoke dedusting system in the second phase of the welding training center of CECC has been completed, let’s find out more about it!<\/p>\n\n\n\n
Sistema de remo\u00e7\u00e3o de fumos de soldadura para centro de forma\u00e7\u00e3o de soldadura<\/p>\n\n\n\n
Este sistema de despoeiramento est\u00e1 localizado no terceiro andar do centro de forma\u00e7\u00e3o de soldadura, com um total de 12 esta\u00e7\u00f5es de soldadura, e continua a utilizar a recolha do tipo corpo de sala.<\/p>\n\n\n\n A sala de soldadura \u00e9 constru\u00edda com uma placa de purifica\u00e7\u00e3o de 50mm, o tamanho da sala de soldadura \u00e9 de 3m3m<\/em>2.2m, a parte superior da instala\u00e7\u00e3o do exaustor, rodeado por uma placa de acr\u00edlico transparente, design de porta deslizante, apoiando a prote\u00e7\u00e3o ambiental azul dos EUA 1 22KW modelos inteligentes de host de remo\u00e7\u00e3o de poeira.<\/p>\n\n\n\n O coletor de p\u00f3 \u00e9 colocado numa posi\u00e7\u00e3o adequada na sala, porque a pe\u00e7a de trabalho tem de ser levantada por cami\u00f5es, pelo que a parte superior da sala telesc\u00f3pica do coletor de p\u00f3 adopta o design da estrutura retr\u00e1til, que \u00e9 conveniente para a pe\u00e7a de trabalho ser levantada por cami\u00f5es, e est\u00e1 rodeada pelas cortinas de prote\u00e7\u00e3o do arco, de modo a que a sala de soldadura esteja num espa\u00e7o relativamente confinado, e os fumos de soldadura n\u00e3o se espalhem.<\/p>","protected":false},"excerpt":{"rendered":" The installation of the welding smoke dedusting system in the second phase of the welding training center of CECC has been completed, let’s find out more about it! Welding Fume Removal System for Welding Training Center This dust removal system is located on the third floor of the welding training center, with a total of […]<\/p>","protected":false},"author":2,"featured_media":935,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[15,14],"tags":[],"class_list":["post-930","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case","category-news"],"yoast_head":"\n<\/figure>\n\n\n\n
<\/figure>\n\n\n\n